September 5th 2003

Today I patched the floor of the bus where the worst of the problem was.  It turns out that the rest of the flooring in the back is in good shape and just looks bad.
After we had the bad parts of the floor cut out we decided to do some major cleaning.  After about 30 minutes trying to clean with the vacuum and damp rags, I hauled in the hose and started hosing everything off.  I figure that if anything electrical gets wet it will dry out over the next week or so.  All of the electricity is disconnected and I avoided the driver's area, so hopefully all will be good when I re-connect in a few days.
While I was washing everything down, Becky was hauling tools and stuff out of the way.  When she got the bus empty, she came back and helped me to sweep the muddy water out of the corners where the water pooled up.

We set up the box fan and within about 1/2 hour, the floor looked like it was drying nicely.  

We hauled all of the tools back in.  I couldn't help but dust everything off as it came back in...  Now that the bus was clean, I didn't want the grime to make it back inside.

The biggest difference besides the clean look of the floor and walls is the fact that the "funky old bus" smell seems to have left too.

It's a big turning point.  The bus is torn down to the sub floor and clean, so now I can get to constructing...  We're taking the weekend off to celebrate and relax a little.  The bus will wait for us until Monday rolls around again.

 

 


Back Up Next

Home ] Expense Log ] Floor Plan ] Thoughts ] Reference ] Links ] About Us ]

Copyright 2003 the Virtual Placebo Group.  All rights reserved.
For questions or comments about this web site, please e-mail busnuts@virtualplacebo.com